Gallery: Shoprite Checkers Cilmor WC

 
Loading of the materials Site establishment Excavete for the new 83m3 UST's Excavation for the 5 x 83m3 UST
Prepairing to install subsoil drains Prepairing to install subsoil drains Subsoil completed with crusher filling DPC sheeting above subsoil drain under the tanks
83m3 tanks on site Installing the tanks Tank no. 4 5 x 83m3 UST's in place
Closing the tanks Closing the semi burried tanks Tanks closed to gound level Installing tank sumps
Backfil to the tank top Manufacturing the filler risers Filler lines Electrical draw boxes
STP's and tank to fittings installed Backfil to tank sump tops Terraforce on site Installing the Terraforce retaining wall
Placing the reinforcing for the cover slab on tank Ready to pump the concrete Pour the cover slab Slab completed
Vent risers and Terraforce complete Delivery line to dispenser sumps Dispenser sumps installed Generator day tank installation
Filler completed Dispensers installed Airial view of the tank farm Forecourt
 