Gallery: Shoprite Checkers Cilmor WC
Loading of the materials
Site establishment
Excavete for the new 83m3 UST's
Excavation for the 5 x 83m3 UST
Prepairing to install subsoil drains
Prepairing to install subsoil drains
Subsoil completed with crusher filling
DPC sheeting above subsoil drain under the tanks
83m3 tanks on site
Installing the tanks
Tank no. 4
5 x 83m3 UST's in place
Closing the tanks
Closing the semi burried tanks
Tanks closed to gound level
Installing tank sumps
Backfil to the tank top
Manufacturing the filler risers
Filler lines
Electrical draw boxes
STP's and tank to fittings installed
Backfil to tank sump tops
Terraforce on site
Installing the Terraforce retaining wall
Placing the reinforcing for the cover slab on tank
Ready to pump the concrete
Pour the cover slab
Slab completed
Vent risers and Terraforce complete
Delivery line to dispenser sumps
Dispenser sumps installed
Generator day tank installation
Filler completed
Dispensers installed
Airial view of the tank farm
Forecourt